
Western Bypass Freising
The City of Freising is building a 3.6 kilometres long bypass in order to reduce the inner-city trafic. Named "Westtangente Freising", the bypass includes 12 civil engineering structures, 11 of which bridges and a retaining wall, as well as a 705 metres long tunnel under the village of Vötting. The tunnel is made up of a conventional tunnel and a top down tunnel section at the southern end.
Client
City of Freising
Construction Period
2015 to 2019
Tunnel Brief
Tunnel design and structural design from first concepts
Preliminary design
Preparation of tender documents
Detailed design to construction supervision and geotechnical speciallist services
Fitout planning
Photo / © EDR GmbH: Tunnel Freising
Photo / © EDR GmbH: Tunnel Freising - North portal