Wertach Vital II, 3rd realisation phase, section 1
As part of the project "Wertach vital II", flood protection measures (dikes, walls, with sheet pile foundations), stabilization measures for the river bed (open revetment), other hydraulic engineering measures (bank expansion, embankment protection) and landscaping measures (planting, paths, etc .) were implemented at a length of 825 m.
Client
Water Management Authority, Donauwörth
Construction Period
2013 to 2016
Brief
Site supervision