Due to the planned routing of the new local bypass in Plattling Ost, the aggradation cassettes 6, 7, 8 and 9 will be reduced in size on the premises of the Südzucker AG, Plant Plattling. To create a replacement volume east of the existing cassettes, the construction of a new cassette 10 is necessary. Depending on the construction operations for the road construction dams have to be rebuilt in different construction phases to a total length of 1,500 m.

Client
Suedzucker AG

Construction Period
2013 to 2019

Brief
Project planning
Structural design
Ground structural verification, QM installation plan
Site supervision, Health and safety coordination