Rescue Gallery Meistern Tunnel, Bad Wildbad

Retrofit of a 1265 metres long rescue gallery for the Meistern Tunnel that allows vehicle access. The escape tunnel runs parallel to the existing tunnel and connects via five cross passages.
A temporary and a permanent shotcrete lining are being used to build the tunnel. Open cut pits with soil nail walls have been used at the portal area. The project also includes a tunnel operation building with a ventilation station.

Client
ÖSTU-STETTIN Hoch- und Tiefbau GmbH, Leoben, Austria

Construction Period
2015 bis 2017<

Brief
Detailed design for the rescue gallery


Photo: © Rainer Kunze, EDR GmbH