Old Schlüchtern Tunnel

Retrofitting and strengthening of the Old Schlüchtern Tunnel by implementation of a watertight inner lining and extension of the tunnel for 60 m by cut and cover method. In addition construction of 7 cross passages between the Old and the New Schlüchtern Tunnel.

Client
DB ProjektBau GmbH Niederlassung Mitte

Construction Period
2011 to 2013
 
Brief
Check Engineering of Detailed Design
Drawings and Structural Fire Engineering on behalf of the German Railway Authorities

Foto: © E. Neun, EDR