Oberföhring Hydroelectric Power Station

The Mittlere Isar power plant series lies between Munich and Moosach. An average of 15 m³/s of residual water is fed into the Isar at the Oberföhring weir and is now used for energy generation by a Kaplan turbine with an installed capacity of 1.0 MW.

Client
E.ON Wasserkraft GmbH

Construction Period
2007 to 2008
 
Brief
Project planning
Structural design
Technical equipment design (M&E)
Health and safety coordination

 

Photo: © EDR GmbH