In-depth Investigation Vilstalsee

According to DIN 19700, special tests and examinations are necessary at dams and flood retention basins, in addition to the routine or annual inspections, in order to be able to reliably assess the safety of the facilities. EDR was commissioned with the in-depth investigation for the hydraulic steel structure, the solid construction and the mechanical engineering of the outlet and spillway structure as well as the pumping station.

Client
Water Management Authority, Landshut

Construction period
-

Brief
In-depth investigation required by DIN 19700 of hydraulic
steelwork, solid construction and mechanical engineering
Diving work
Organisation and project management