
Hydraulic Investigations Rohrdorfer Ache
In the years 2013 and 2014 floods occurred at the torrent Rohrdorfer Ache. As a result, hydraulic investigations were carried out on the actual state for a total length of 12 km, including the Hoellgraben, Speckbach and Weissbach creeks, and then the flooded areas were determined and calculations on the bridge structures were carried out to prevent logjams.
Client
Water Management Authority, Rosenheim
Construction Period
in planning stage
Brief
Survey services
Hydraulic calculations
Determination of flood areas
Photo: © EDR GmbH