Gottfrieding Hydroelectric Power Station

A hydroelectric power plant with two Kaplan turbines already existed at the Gottfrieding barrage. In order to make use of the additional water available, another power plant (5 MW) compliant with the German Renewable Energies Act (EEG) with a pit turbine (discharge rate: 100 m3/s) and a fish ladder was constructed.

Client
E.ON Wasserkraft GmbH
Mayerhofer Hoch-, Tief- und Ingenieurbau GmbH

Construction Period
2008 to 2009
 
Brief
Conceptual study
Project planning
Structural design

 

Photo: © EDR GmbH