Flood Retention Basin Engetried

To improve the flood protection at the Guenz river,  the construction of a flood retention basin inear the municipality of Engetried is planned. The retention volume is 1,290,000 m³. The basin is planned as a shut-off dam up to 9.0 m high and 543 m long and a two-span control structure (regulation 10.0 m³/s) in conjunction with a flap gate spillway and electrical control.

Client
Water Management Authority, Kempten

Construction Period
2021 to 2023

Brief
Project planning
Structural design
Traffic planning
Technical equipment design
Geotechnic

Photo: © EDR GmbH