Flood Protection Westendorf
The village of Westendorf is to be protected by a dike, running on the southwestern outskirts, from a 100-year flood event. In addition, a new reinforced concrete structure will be erected, which regulates the flow in the direction of the village to a maximum of 5 m³/s in the event of a flood. Another component is the ecological development of the Schmutter river, including a partial relocation of the right bank dike.
Client
Water Management Authority, Donauwörth
Construction Period
2020 to 2021
Brief
Project planning
Structural design
Site supervision, health and safety coordination
Hydraulic calculations
Photo: © EDR GmbH