Flood Protection Hengersberger Ohe

On the right side of the Danube river Polder Hengersberg-Gundelau an existing pumping station is located in the eastern part of the district Altenufer of the municipality Hengersberg. A closer inspection of the catchment area showed that the existing flow rate of 250 l/s is insufficient. Therefore, the pumping station is to be replaced by a new building with tubular casing pumps with a flow rate of 850 l/s and a delivery height of approximately 3.7 m.

Client
Water Management Authority, Deggendorf

Construction Period
in planning stage

Brief
Project planning
Technical equipment design