Flood Protection Bruckmuehl CS 03
The project flood protection Bruckmühl "construction section 03" is part of the overall project "flood protection Unteres Mangfalltal". For this purpose, the existing, running directly at the Mangfall river, dike is completely removed and a new dike is rebuilt in restored position. Over the entire length of the dike, an inner seal is provided as a reinforced mixed-in-place wall (MIP wall).
Client
Water Management Authority, Rosenheim
Construction Period
2015 to 2016
Brief
Project planning
Structural design
Site supervision
Survey services, external supervision