Flood Protection Bad Aibling CS 02

As an immediate measure after the flood in June 2013, the exciting dikes were remediated with a static effective interior seal (FMI method) at the Mangfall river, in the "construction section 02" in Bad Aibling. The dikes were increased by up to 1.0 m over a length of 750 m (south side) and 1,350 m (north side). Furthermore, the dike had to be widened to 3.5 m crown width and also to be relocated over a length of about 150 m.

Client
Water Management Authority, Rosenheim

Construction Period

2013 to 2014

Brief
Project planning
Structural design
Site supervision
Health and safety coordination