Farchant Tunnel

The main component of the Farchant local bypass is the tunnel, consisting of 2 parallel tunnel bores approximately 2,380 m in length that begin immediately beyond the Loisach Bridge at the eastern river bank of the Loisach and connect to existing highways B2 and B23 at the northern end of the city of Garmisch-Partenkirchen.

Client
Joint venture of Bilfinger Berger / Hochtief


Construction Period
1995 to 2000
 
Brief
Detailed design, construction drawings for the TBM tunnel,
structural design