Construction supervision and monitoring River Group Lech

Uniper Kraftwerke GmbH, River Group Lech, operates a total of 23 barrages at the river Lech. Extensive measuring systems for building monitoring are installed in the individual barrages. In total, there are about 1,300 measuring points (groundwater, bottom pressure, water quality, precipitation, etc.). The construction supervision and the monitoring are done by EDR.

Client
Uniper Kraftwerke GmbH

Construction Period
-

Brief
Construction supervision
Monitoring

Photo: © EDR GmbH