Construction of a new hydroelectric power station

Our client is helping to promote renewable energies by building a new hydropower plant (Kaplan axial turbine with stationary shaft, installed capacity of 1.2 MW) and refurbishing existing station components. The existing hydropower plant will be maintained as a historical structure.

Client
Anonym

Construction Period
2011 to 2014
 
Brief

Project planning

Structural design

Technical equipment design (M&E)

Survey services

Health and safety coordination

 

Photo: © EDR GmbH