Badush Dam, Iraq

With construction of the Badush Dam taken up in the late 1980th, but abandoned later on, as well as the existence of a detailed design from 2009 that has not gone to tender, the Ministry of Water Resources is seeking to finish the project in 2 stages: Stage 1 will see the construction of a 30 m high dam and hydropower plant with a capacity of 170 MW and optional stage 2 will see an increase of the dam height to 90 m as a protective measure for the possible failure of the upstream Mosul Dam.

Client
Iraq Ministry of Water Resources.

Construction Period
in planning stage
 
Brief
Evaluation for the existing structures and design studies
Environmental Impact Assessment
Feasibility Study

 