Amper Canal Refurbishment

Some 5.9 km of the approximately 8.7 km long canal for the Haag a.d. Amper hydroelectric power station was refurbished by securing the banks with river mattresses and armour stone. The remaining 800 m long concrete channel was lined with plastic sealing sheets.

Client
E.ON Wasserkraft GmbH

Construction Period
2011 to 2012
 
Brief
Project planning
Stability analysis
Hydraulic calculations

 

Photo: © EDR GmbH